• Daily News
  • Weekly News
  • Special Editions
  • Oil and Gas Events
  • Key Economic Indicators
  • Other Services
Country List
  • Algeria
  • Bahrain
  • Egypt
  • Iran
  • Iraq
  • Kuwait
  • Libya
  • Oman
  • Qatar
  • Saudi Arabia
  • UAE
  • Yemen
  • General News
PAM
  • Project Activity Monitoring
  • Company Activity Monitoring

For Free Headlines Submit Your Email

Login  

Tuesday, July 15, 2025 10:52 GMT

  • Home
  • About Us
  • Archive
  • Contact Us

News

Iranian Refinery Goes Under Furnace Repair while Operating


For the first time in Iran, the experts at the Bandar Abbas Oil Refinery ( Bandar Abbas Oil Refinery Optimization ) succeeded in breaking the record of repairing the roof of an operating furnace, a record which previously belonged to an American company.

According to the Bandar Abbas Oil Refining Company, with assistance from a knowledge-based company, part of the furnace roof of the distillation unit No. 2 of the company, which was damaged, was repaired in the shortest time by the engineers and specialists of Bandar Abbas Refinery.

In this regard, Reza Khavarsangari, maintenance and repair manager of Bandar Abbas Oil Refining Company, said: “In these repairs, part of the roof of Unit 71 furnace, which was damaged due to high heat, and melting and damage to internal insulation was repaired with the participation of a local knowledge-based company by using a stand and fireproof foam injection and round-the-clock work.”

He stated that due to the need for continuous production, it was not possible to deactivate the unit, adding: "Repairs were carried out in the conditions of furnace operating which took place for the first time in the country.”

The maintenance manager of Bandar Abbas refinery stated: “Due to the need for repairs during the unit's operation, with the participation of a knowledge-based company active in the production of repair and insulation materials and due to the size of the damaged furnace, stands were placed on the roof and were stabilized outside the furnace and then injection of fireproof foam was carried out.” - Shana


published:29/06/2021 05:55 GMT

Related News

  • Iranian Refinery Increases Crude Oil Refining Capacity  14/03/2021 05:41 GMT
  • Official Explains about Optimization Project of Iranian Refinery  27/01/2021 05:06 GMT
  • Iran Refinery Projects Unfazed by Sanctions  10/11/2020 07:52 GMT
  • Iran Introduces Refinery Optimization Projects for Grace Period ...  08/11/2020 08:51 GMT

© 2025 BEDigest. All Rights Reserved.

to read more about this project please go to